Daily drilling / station
Daily drilling / station
Daily drilling / station
Highest:78.81 Lowest:76.22
Highest:85.34 Lowest:84
Products
Product introduction:The TC1A-CH is same as TC1A-EN but is arranged for a maximum of one control line up to 3/8”OD, which is terminated at the bottom of the hanger. The TC1A-CH hanger is made to work in conjunction with the TC1A-CL tubing bonnet.